Inquiry Basket ( 0 )
Company Details
  • WENZHOU WINIBER MACHINERY EQUIPMENT CO., LTD.

  •  [Zhejiang,China]
  • Business Type:Manufacturer , Trade Company
  • Main Markets: Africa , Americas , Asia , Middle East , Worldwide
  • Exporter:91% - 100%
WENZHOU WINIBER MACHINERY EQUIPMENT CO., LTD.

WENZHOU WINIBER MACHINERY EQUIPMENT CO., LTD.

Title
  • Title
  • All
Home> Industry Information> Bottled Mineral Water Filling Machine Installation and Commissioning Steps

Bottled Mineral Water Filling Machine Installation and Commissioning Steps

August 31, 2020

  The bottled mineral Water Filling Machine is a self-priming filling of the leather tube, and the leather tube is placed in the material storage barrel. Under the action of the cylinder pulling the piston rod, the material enters the metering cylinder through the self-suction tube and the three-way lower check valve, and then The piston pushes the piston to push the material out, and the material enters the container through the three-way upper check valve, the leather tube and the filling head, and the amount of the filling is determined by the magnetic control switch controlling the stroke of the cylinder.


Installation and commissioning of bottled mineral water Filling Machine

1. Install and then debug, read the instructions carefully before commissioning, and prepare the tools used.


2. After the installation, brushing machine and the rinsing machine are installed, the filling track and the bottle receiving tray are leveled, the liquid storage tank is filled with materials, and all the electrical switches are in the closed position.


3. Fill the container into the tool box, connect the external power supply, the power socket must be a three-pin socket, and have a reliable grounding wire to prevent the chassis from leaking power, turn the machine power switch to ON, and the power indicator light.


4. The mounting support plate holds the filling frame and points to the positioning sleeve on the top filling head. The positioning sleeve should be able to move up and down flexibly, and the filling needle is exposed or retracted without hindrance.


5. The switch under the liquid storage tank is turned to the open position, so that the material can flow into the total metering pump. According to the total filling amount of each container, adjust the screw on the crank and rotate the knob of the filling speed control board to 20 degrees. Left and right, then turn the switch on the filling speed control board to the open position.


6. When the filling head out of the liquid is the set amount, screw the liquid amount fine-tuning nut, cover the filling head housing, and loosen the filling bracket support plate.


Img 7267c

The above is the Bottled Mineral Water Filling Machine Installation and Commissioning Steps we have listed for you. You can submit the following form to obtain more industry information we provide for you.

You can visit our website or contact us, and we will provide the latest consultation and solutions

Share to:

Send Inquiry

Home> Industry Information> Bottled Mineral Water Filling Machine Installation and Commissioning Steps
Communicate with Supplier?Supplier
Wini Zhou Ms. Wini Zhou
What can I do for you?
Chat Now Contact Supplier