What is Mineral Water Bottling Machine cost? What is the completely line should be included? How to get raw materials, like preform and bottle? Can we produce raw material by ourself? How to achieve the maximum benefit with speed, accuracy and light weight bottles? Winiber, the expert in preform production line, Bottle Production Line and liquid Filling Machine, always provide you with the best solution for your products!
Model | XGF14-12-5 | XGF16-16-5 | XGF18-18-6 | XGF24-24-8 | XGF32-32-8 |
Washing heads | 14 | 16 | 18 | 24 | 32 |
Filling Heads | 12 | 16 | 18 | 24 | 32 |
Capping heads | 5 | 5 | 6 | 8 | 8 |
Capacity(b/h) | 5000 | 8000 | 10000 | 12000 | 15000 |
Power(kw) | 1.5 | 2.2 | 2.2 | 3 | 3 |
Dimension(m) | 2.2*1.55*2.45 | 2.85*2.45*2.45 | 2.91*2.15*2.45 | 2.85*2.2*2.45 | 3.43*2.63*2.45 |
Weight(kg) | 2000 | 2400 | 2500 | 4200 | 6000 |
Voltage | 380V/220V | ||||
Suitable bottle shape | Circular, square | ||||
Suitable caps | Plastic screw cap | ||||
Bottle diameter(mm) | 50-90 | ||||
Bottle height(mm) | 150-310 | ||||
Compressor air pressure(Mpa) | 0.3-0.7 | ||||
Washing medium | Aseptic water | ||||
Washing pressure(MPA) | 0.25 |
We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line. Our exporting product includes: Injection molding machine, Pet Preform Mould, Plastic Bottle Blowing Machine, Water Treatment system, water filling machine and Packaging machine etc.
Q: What is the warranty if we buy your machines?
A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.
Q: How about the spare parts?
A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.
Q: How to install my machines when it arrives? What is the cost?
A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).
Q: How long time for installation?
A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.
Q: When can I get my machine after I paid?
A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.
Product Categories : Filling Machine > Water Filling Machine
5L Water Bottling Machine
2000BPH Water Bottle Filling Machine
4000BPH Water Bottling Machine
6000BPH Water filling machine
6000BPH Mineral Water Bottling Filling Machine
10000BPH Drinking Water Machine
15000BPH Beverage Filling Machine
20000BPH Mineral Water Filling Plant