Automatic Water Filling Machine (3-in-1) CGF8-8-3 is mainly applied for filling beverage. Integrating with washing, filling and sealing, it realizes full automation in the whole process. Suitable for polyester bottle and plastic bottle filling of mineral water and purified warer. The bottle types applicable for various parts are easily, conveniently and rapidly adjustable. It adopts new micro-negative pressure filling, stable and reliable.
Model | CGF 8-8-3 |
Washing workstation | 8 |
Filling workstation | 8 |
Capping workstation | 3 |
Production capacity(500ml)(B/H) | 2000 |
Suitbale bottle specification(mm) | Φ=50-100, H=170, Volume=330-2250ml |
Motor power(KW) | 2.2 |
Overall dimension(mm) | 2300×1700×2000 |
Weight(kg) | 2500 |
Model | Washig heads | Filling heads | Capping heads | Production B/H |
CGF14125 | 14 | 12 | 5 | 3000-4000 |
CGF18186 | 18 | 18 | 6 | 5000-7000 |
CGF24248 | 24 | 24 | 8 | 8000-12000 |
CGF323210 | 32 | 32 | 10 | 12000-15000 |
CGF404012 | 40 | 40 | 12 | 16000-20000 |
CGF505012 | 50 | 50 | 12 | 20000-24000 |
CGF606015 | 60 | 60 | 15 | 25000-30000 |
CGF808020 | 80 | 80 | 20 | 35000-40000 |
We have more than 20 years knowledge and experience on PET Water/juice/carbonated drinks production line. Our exporting product includes: Injection molding machine, Pet Preform Mould, Plastic Bottle Blowing Machine, Water Treatment system, water Bottle Filling Machine and Packaging machine etc.
Q: What is the warranty if we buy your machines?
A: We offer the high quality machines with 1 year guarantee start from the machine reach to your factory. Also your share the lifelong technical support.
Q: How about the spare parts?
A: We will send one year enough spare parts together with machines for your stock. During the warranty time, if some spare parts broke without human problem, we will send free for you.
Q: How to install my machines when it arrives? What is the cost?
A: We will send our engineer to your factory to install the machines and train your engineers how to operate and maintain the machines. Customer pay for visa, round-trip tickets, room and accommodation, also USD80/day/ person(engineer salary).
Q: How long time for installation?
A: According to the machine you order, usually we will send one or two engineer, it takes about 7to 20days.
Q: When can I get my machine after I paid?
A: Usually the production time is around 25-60 days. The exactly will be decided by which machine u order.
Product Categories : Filling Machine > Water Filling Machine
4000BPH Water Bottling Machine
6000BPH Water filling machine
6000BPH Mineral Water Bottling Filling Machine
10000BPH Drinking Water Machine
15000BPH Beverage Filling Machine
20000BPH Mineral Water Filling Plant
24000BPH Bottle Filling Machine
100BPH 5 Gallon Bottle Washing Filling Capping Machine